DAY ONE 1 1/2” ASPHALT GRIND

CASP INSPECTION and correction for ADA PARKING STALL

DAY TWO INSTALL

DAY TWO ROLLING OUT

Need a solution that lasts more then 6 months for the big crack problems

Need a solution that lasts more then 6 months for the big crack problems

Asphalt Crack repair

using an Asphalt Infrared Heater

Infrared Asphalt heater can heat up to 1000 degrees, heating the asphalt up to 450 degrees two inches down. Scrape the asphalt, add asphalt binder, even out with the lute compact with vibratory compactor plate. Ideal for large crack repairs. Heat and add asphalt to heavy vehicle wear marks in the asphalt. Patch alligator cracks.

INFRARED ASPHALT HEATER REPAIR

Heat up the area, rake the cracked area, add asphalt binder, add asphalt, compact.

DAY TWO 1 1/2” ASPHALT OVERLAY

DAY THREE PAINT STRIPE

DAY ONE DEMO AND GRADE

DAY ONE BASE INSTALL AND COMPACT

DAY THREE PAINT STRIPE

Infrared Asphalt Heater job site set up and prep

Infrared Asphalt Heat Repair to fix large cracks and alligator cracks. Why do an overlay that doesn't last? Heat, rejuvenator, a couple shovels of hot mix, & vibratory plate. DONE

BEFORE

BEFORE

Parking lot has large cracks and water has been pooling. Recommend full demo of asphalt and base. Install 4 inches of new base and compact. Install 4 inches of new asphalt and compact.   OR IAH REPAIRS to hold of on major repairs.

Parking lot has large cracks and water has been pooling. Recommend full demo of asphalt and base. Install 4 inches of new base and compact. Install 4 inches of new asphalt and compact. OR IAH REPAIRS to hold of on major repairs.

AFTER

AFTER

200 Linear feet of Asphalt crack

200 Linear Feet of repaired Asphalt Cracks

READY FOR SEALCOAT!

READY FOR SEALCOAT!

if full demo and Overlay is not in the budget, then asphalt infrared heater repair might be the answer.

TWO hour old asphalt patch. Compacted with a vibratory plate. Trash truck parks on top of patch.

“it’s better to have 6 inches of base and 4 inches of asphalt then to have 6 inches of asphalt and 4 inches of base.” The most important thing is to start with a good base, compact every two inches. Once asphalt has started to alligator there is a good chance that the base has been compromised, and the only thing to do is R&R the area.